“PERENCANAAN MANAJEMEN WAKTU PEKERJAAN STRUKTUR GEDUNG KETERING 5 LANTAI MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM)” (2026) KEDUNG KARYA, 1(2), pp. 12–20. Available at: https://jurnal.uniwa.ac.id/index.php/kedungkarya/article/view/589 (Accessed: 18 November 2026).